Saturday was spent applying a second coat to this, and touching up that – either paint or drywall compound.  It’s the little things, the details, that take an inordinate amount of time and slows you down.  The Galley (kitchen) has now been fully primed, painted, second coated and touched up. Walls, cabinets, even inside cabinets are complete.

UP NEXT: installing wood plank countertops and Ikea farmhouse sink, and painting the 2’x3′ vestibule.

Advertisements