Another beautiful Saturday to do a little work at the farmhouse. Cassie removes the counter-top (floor tile on top of Formica!) in the kitchen.  Then, she and I tear off drywall from the termite and rot damaged wall (which is adjacent to the bath). We are getting closer and closer to being able to do a little reconstruction instead of more demolition. Our plans are to get “The Privy” back in order and then move inward.

“February is merely as long as is needed to pass the time until March.” -Stockton

Advertisements